Search results ( 1 - 10 of 10 )

4 November 2019

Stockholm Blog #11: Beyond GrowSmarter — what is ahead in Stockholm

We have less than two months left of the GrowSmarter project and it is time to look ahead. When we started the project, Stockholm was already growing fast and needed smart solutions for the growth to be sustainable. This growth has only accelerated and 140 000 new apartments and 280 000 new inhabitants are expected by 2030. Combined with the goal of becoming fossil-fuel free in 2040 Stockholm faces some challenges, but are there answers to find in the GrowSmarter project?

Actually, there are. Quite many indeed.

Better use of urban space

One of the first issues of growth is the use of land and city space. We need to use urban space very wisely. Let’s start with waste. What space is necessary for different waste handling methods. The numbers below are from a Swedish study where a waste collection system sorting into three fractions for 1700 households was evaluated:

  Waste collection and land use per household Waste collection land use for 140 000 new apartments
Conventional bin system 0,93 m² 130 000 m²
Conventional automated waste collection system 0,17 m² 24 000 m²

Then we have Envac’s smart waste handling system in Valla Torg. It is collecting 4 fractions, but all in one and the same inlet depositing into one terminal (container). So we collect four fractions and use one third of the space of the conventional AWCS evaluated above. This means that we use less than 0,06 square meters of land per household which would “only” total 8 000 square meters for all new inhabitants expected in Stockholm. Stockholmshem, the housing company, is currently building 160 new apartments near Envac’s smart waste system, and they only need to install the inlets as the terminal can easily handle the waste from these new households.

The same principle applies to the green parking index. The electrical car and cargo bike pool can provide mobility services to inhabitants using only a fraction of the space needed by private cars. Already deployed in Valla Torg, these mobility solutions are also available for the 160 new households thus minimising the need for parking space in the new buildings. This saved parking space alone can pay the additional costs of these mobility services. These are two great examples of smart sustainable solutions which also helps a growing city using its valuable space wisely.

Smarter waste collection leaves more urban space open. Photo: Envac

Re-using and storing power

We also need to heat up these 140 000 new apartments. In Stockholm, most buildings are connected to the district heating system. Stockholm Exergi has proved in GrowSmarter that waste heat from data centers or supermarkets can heat up buildings. In 2018 these and other waste heat sources heated up 31 000 apartments. The ongoing installations alone can heat up an additional 27 000 apartments in Stockholm. That means almost 60 000 apartments are heated up with heat that used to go to waste. With the expansion of data centers in Sweden it is not a far-fetched idea that all the 140 000 apartments could be heated with waste heat from data centers. There are data center providers which build their data centers under ground, thus not taking valuable space above ground, but still providing waste heat to the district heating system.

Waste heat recovery from data center. Photo: Stockholms Exergi

 

Stockholm still needs to reduce the need for heat in buildings. Skanska showed together with Stockholmshem and L&T that it is possible to reduce the energy need in existing buildings up to 75%. On a larger scale, Stockholmshem found, it is economically feasible to reduce energy use in existing buildings with the solutions installed in Valla Torg by 50%. Combining waste heat recovery with energy efficient refurbishment is one approach that could help Stockholm phase out the last coal and oil used in district heating well before 2030.

Stockholm, as many other cities, is facing an increased electrification. More data is processed, or should I say more and more videos are uploaded, shared and streamed, which demands more data centers. Data centers already consume as much electricity as the UK and this is rapidly increasing. In addition we have the electrification of vehicles and the use of heat pumps also demand electricity. We need to consider that Sweden is phasing out nuclear power, which means that we will be more dependent on renewable energy sources. As the sun doesn’t shine and the wind doesn’t blow all the time, we need electricity storages more in the future than now. L&T has combined photovoltaics, smart electricity management and battery storage in commercial, residential and office buildings in GrowSmarter. Even if battery storage currently is not economically feasible it will be increasingly so in the future. Battery storage can be used in two ways. In summer you store the overproduction of solar electricity there and in winter you cut electricity effect peaks with the storage. The latter is already done now, but will be even more important in the future. The results from the private condominium Årstakrönet where L&T has managed these solutions is very promising as the amount of electricity from the grid could be reduced with more than 30% with these and electricity saving measures. Peak loads have also been shaved and the three phases are no longer running a risk of being overloaded for instance when electrical vehicles are charged.

Streetlights are also abundant in Stockholm with more than 150 000 of them all running on electrictiy. The smart street lights installed show that electricity can be reduced between 20-45% compared to traditional LED-lights. The Traffic Department of Stockholm is now working to find the best solution and open platform to upscale the solutions and are testing this in Stockholm.Lastly the increased population will mean more people and more goods on the streets of Stockholm. As we do not have the space or possibility to build new streets and roads, we need to use the existing infrastructure in a much more efficient way.

Smarter solutions for a connected city

The construction logistics center implemented by Carrier is one such solution. When the construction material needed the day after is transported to the construction site the evening before, we can move these transports from times with a lot of traffic to times with less traffic. The waste can also be collected at the site with the returning transport in the evening. The overall traffic to the construction site will also decrease with the construction logistics center and these transports can be made with vehicles using biofuels as was done by Carrier. Considering that 140 000 apartments need to be built, the amount of construction material traffic will be high the next ten years and it will be important to implement this type of solution widely in the city. Interestingly, studies show that of the heavy transports in a city almost 30% are waste transports. The Envac waste solution mentioned above not only needs less space, but also reduced waste transports in the area with 90%.

Smart Connected steeet environment is key for controlling flows in the smart City. Photo: IMB

Sensor technology, connectivity, big data combined with artificial intelligence are means by which the city better can manage traffic flows in a city. In the Slakthus-area, the city together with IBM can show traffic flows of vehicles, pedestrians and bicyclists in real time. We can predict congestion, we can understand how weather or different type of events correlate with people and traffic flows in the streets. We can use this information to guide people to transport themselves to and from the area in a sustainable, yet faster, way. As the Slakthus-area will be a large construction site the coming 10 years this information is essential to understand how construction transports, goods transports, event visitor traffic and other traffic can be managed in the often narrow streets. The new subway station will for instance guide a very large flow of people into Rökerigatan, which will be a main commercial street in the area. This street will not have separate pavements or bike lanes, so all modes of traffic needs to share the same street. By predictive flow analysis, especially regarding events, it is possible to manage goods transports and deliveries, so that they do not collide with people going to events.

If this sounds at all interesting I do welcome you to follow our final conference on December 3rd, where all these solutions will be showed as part of the study visit programme. If you have not signed up for the event, you can stay updated by following GrowSmarter on Twitter.

 

Mika Hakosalo

Site Manager, Stockholm

For the previous blog post, click here

 

29 June 2018

Stockholm Blog #9: Looking at first evaluation results

In 2014, when we selected the smart solutions and the partners that would implement these in Stockholm, we wanted to show how a city can tackle the sustainability challenges of rapid urban growth. Now that these solutions are in place we want to evaluate the results to show that we can achieve the goals initially defined and do so in an economically sound way. When we look at the first set of evaluation data collected we can see at the same time promising results, no results at all and negative results. In many cases we simply do not have enough data to give an accurate answer. Also the systems have in many cases not been fully optimised and/or is running on partial capacity, so it is too early to define if they are working well.

Action area 1: Low-Energy Districts - What is happening in Valla Torg, Årsta and the Slakthus area buildings and what results do we have?

In Valla Torg the refurbishment of the two first multi-storey buildings (7G and 6) and the low-storey building 8 are finalised and the tenants have moved in. The evaluation of energy use has started, but the first set of evaluation data is not complete, so it is too early to tell how well the energy efficiency measures have worked. Refurbishment of the other buildings are still in progress and will be finalised between September 2018 and January 2019.

In the private condominia Brf Årstakrönet the evaluation is on its second year. The use of electricity, water and energy used for heating is evaluated. Each energy source is followed on a monthly basis and compared to the baseline.  Also the amount of solar energy produced by PV cells are measured.

Compared to 2015, the first full operational year of savings was around -10%, for district heating -30% for electricity (not including electricity used in apartments) and -4% for water.

In Slakthusarea the refurbishment of building 8 is finalised. The evaluation of energy use has started, but as the building and energy measures were so recently done there is no data yet available telling how well the energy efficiency measures have worked. The substitute buildings Kylhuset in Slakthusareaare also finalised for building related energy efficiency measures. The waste heat recovery will be installed in summer 2018 as well as the PVs combined with battery storage.

Action area 2: Integrated Infrastructures

Installing smart LED-lighting

The smart LED-street lights (solution 5) have now been in operation for 1,5 years and the system has worked well. There are three sub measures implemented and evaluated and the results for the first year of evaluation is presented below. It is important to understand that the baseline is LED-street lights. So the energy saving of replacing a metal halogen street 50 W with LED light of 30W is not included. This saving is about 30%.

  • The first sub measure is “Sensor controlled LED lighting for pedestrian and bicycle paths” to enable the lights to provide base lighting to satisfy the feeling of safety at all times and increase the level of lighting when someone approaches. The first 12 months of evaluation indicate an energy saving of 45,9% a year. The original target of 40-50% savings was thus reached.
  • The second sub measure is “Self-controlled LED street lighting with pre-set lighting schemes”. The first 12 months of evaluation indicate an energy saving of 14,4% a year. The original target of 20% savings was not reached in this first year.
  • The third sub measure is “Remote controlled LED street lighting which can be controlled from a distance”. The first 12 months of evaluation indicate an energy saving of 19,3% a year. The original target of 30-50% savings was not reached in this first year.

The next step will be to define how cost effective these sub measures have been.

A Smart Connected City

The aim of the measure 5.2 is to implement in the city environment, if possible on existing infrastructure, sensors for data collection, analysis, visualization and via an IOT platform also test the possibilities to use sensor data for direct communication to citizens as well as using flow data to pre-program and steer city infrastructure such as street lights.

Two types of sensors have been implemented in the Slakthusarea. The first type is 10 sensors for measuring vehicle traffic on a real-time base and the second type are wifi-based sensors to measure pedestrian and bicyclist traffic. The data from the sensors are analysed and visualised in the IOT platform provided by IBM. Below are some examples of visualised data analytics.

IBM, who is responsible for the open consolidated big data platform (solution 8), will build up a multiuseable data platform where real-time data can be analysed, but also were the data can be turned into practical usecases reducing transport emissions and increasing the quality of life for citizens. The development work is done in an agile process were users from different city organisations work together with IBMs development team. Currently the development team is working on developing a mobile application to help event visitors in the Slakthusarea to navigate in the area is a best possible way. In autumn the development team will start working with how the flow data collected could be used to steer street lights in the area.

CO2 emission (g/km) from passing vehicles (left) and amount of pedestrians in the area during an event (right)

Smart waste handling

The waste handling system provided by Envac has been running since the summer 2017. This solution (Measure 7.1, 7.2, and 7.3) demonstrates a smart waste solution for residential areas using differently coloured bags for different sorts of waste, transporting the bags long distance underground and sorting them automatically in a treatment plant. There are yet only two inlets in operation in the installation due to the general time plan of the refurbishment of the Valla torg site. When the AWCS is in full operation there will be 13 inlets, thus increasing the amount of waste significantly, in turn making the evaluation more relevant. The organic fraction can be used for biogas production, which in turn can be used in vehicles. So it is very promising that this fraction per quantity is the largest. 

Waste sorting results
Color Fraction Quantity Distribution
White Rest fraction 76 20,4%
Yellow Paper packaging 90 24,1%
Orange Plastic packaging 80 21,4%
Green Organic fraction 127 34,0%

Action area 3: Sustainable Urban Mobility

Building logistics centre and delivery boxes

The Building logistics centre (solution 2) implemented by Carrier, will start handling more materials for the last buildings to be refurbished in Valla Torg. Unfortunately the evaluation data is not yet available, so it is not possible to define how well the solution is working.

The implementation of delivery boxes (solution 9) by Carrier is done. The delivery boxes are actually a delivery room, which later on can be used for other purposes. The delivery room can be easily used for any type of deliveries, small and big. The deliveries are transported by bike to the room. When the package has arrived the tenant will get a message and with an app, open the door and then go and collect it.  The tenant can also put returning packages in a special shelf. As the system has been in use for a short time, only a tenfold of packages were delivered. The camera surveilled room together with identification of users and specified door codes guarantee that a package is not accessed by other users by mistake.

logistics_center.png" />From package delivery by bike to pick up from Tenant using the app

Smart Traffic Management

Insero has together with NOAE (Network of Automotive Excellence) implemented an information system for drivers (solution 10). Effects on travel time and the drivers’ experiences has not yet been evaluated.

KTH has developed a smart phone application to follow up changes in travel behaviour. In the same application, information about renewable fuels in Stockholm will be shown. The application is launched, but no evaluation data is available.  

Alternative fuel driven vehicles

As part of the GrowSmarter project, Fortum will install up to 10 charging stations and one fast charger (solution 11). The fast charger is installed in Årsta. The normal chargers are also installed in Valla Torg.

The first four refuelling stations for renewable fuels are up and running. The filling station in Årsta is expected to be built in 2018. Data from the first refuelling station shows some drastic results. The station was launched in 2016 as a renewable station and drivers did not think they could also get traditional diesel there. When they did understand this, the diesel sales increased. It is important to remember that only 10% of all trucks in Sweden are defined as green vehicles, so in that perspective 18% sales of biogas is a good result.

Stockholmshem launched its electrical carpool (solution 12) for tenants and habitants in February 2018. In February and March there were 14 tenants who have enrolled themselves to the carpool. The cars are frequently used especially during weekends.

Communication and marketing

An event for tenants in Valla Torg was organised 18th of April 2018. In the events Stockholm Site partners showed smart solutions for the tenants and they could also test solutions like the cargo bike. The event was successful and received positive feedback from tenants.

All photos from the tenant event was taken by Bengt Alm.

In Slakthusarea an inauguration was held 15th of May introducing the smart solutions implemented in the area. Some 100 persons from different organisations attended the event. It was a wonderful weather and the visitors had a possibility to both listen to presentations as well as see the solutions in practice in a study visit.

All photos from the Slakthusarea event was taken by Sven Lindwall.

With this I want to wish you a very nice summer.

 

Mika Hakosalo

Site Manager, Stockholm

For the previous blog post, click here

22 February 2018

Stockholm Blog #8: Inside a flow

Csíkszentmihályi, who defined the state of flow, has said, "If challenges are too low, one gets back to flow by increasing them. If challenges are too great, one can return to the flow state by learning new skills.". Even if it is often referred to a personal state of mind, it could also be put in the context of the smart solutions implemented as a joint effort in Stockholm. Most of the solutions in Stockholm are implemented the first time in a larger scope, with high goals and a very tough schedule, but they are also very tightly linked to each other. Now that the implementation phase for most parts is over or in a repetitive phase it becomes evident how challenging the project actually has been and how it has required developing new skills. Now we are stepping out of this state of flow and starting sharing our experiences. And I think we have a very interesting story to tell.

Action area 1: Low-Energy Districts

What is happening in Valla Torg, Årsta and the Slakthus area buildings?

To see all the measures to be implemented, click here

In Valla Torg the refurbishment of the two first multi-storey buildings (7G and 6) are finalised and the tenants have moved in. The evaluation of energy use has started and will continue until the end of the project to secure a 2-year evaluation time.

The second half of the low-storey building 8 is finalised and tenants have moved in.

In the private condominia Brf Årstakrönet the evaluation is on its second year indicating clear energy savings.

In Slakthusarea the refurbishment of building 8 is finalised. The new tenant, nightclub Slaktkyrkan, is open and have a full schedule of live shows planned for this spring. The pictures below show some of the energy efficiency measures implemented.

New interior window with u-value 0,6, the external window is original

The building with integrated solar panels on the southern side (upper right) of the external glass roof, all lights are LED-lights

The substitute building Kylhuset in Slakthusarea is also finalised for building related energy efficiency measures. The waste heat recovery will be installed in summer 2018.

Action area 2: Integrated Infrastructures

To see all the measures to be implemented, click here

Installing smart LED-lighting

The smart LED-street lights (solution 5) have now been in operation for 1,5 years and the system has worked well. The results have been so promising that now the City of Stockholm will scale up this solution on a district level.

A Smart Connected City

In Stockholm the smart connected city will use the extensive fibre network provided and administered by Stokab, a company owned by Stockholm City Council (more information) Several Internet of Things applications and solutions can be developed thanks to the fibre network.

The implementation of sensors in the Slakthusarea is soon finalised. Most of the sensors for vehicle traffic flow measurements are now installed and most of the wifi-based sensors are going to be installed within the next two weeks.

Vehicle sensor installed measuring in- and outcoming traffic in Slakthusarea

Sign informing pedestrians and bicyclists of traffic flow measurements

IBM, who is responsible for the open consolidated big data platform (solution 8), will build up a multiuseable data platform where real-time data can be analysed, but also were the data can be turned into practical usecases reducing transport emissions and increasing the quality of life for citizens. The development work will be done in an agile process were users from different city organisations work together with IBM:s development team.

Waste Heat recovery

Fortum’s open district heating (solution 6) system has been operating during the heating season and has given better results than expected. The heat recovery can thus heat up more than the earlier calculated 700 apartments.

Smart waste handling

The waste handling system provided by Envac has been running since summer. The system has worked well with the bags provided for this purpose, but in some cases the tenants have used other plastic bags which has unfortunately broken. In the picture below you can see how the waste fractions look like inside the container before the delivery to the end sorting facility.

Mixed different coloured bags inside the container

Action area 3: Sustainable Urban Mobility

To see all the measures to be implemented, click here

Building logistics centre and delivery boxes

The Building logistics centre (solution 2) implemented by Carrier, will start handling more materials for the last buildings to be refurbished in Valla Torg. Carrier has together with Skanska agreed which material streams can be best handled by the logistics centre, and these materials will be handled by the centre during 2018.

The implementation of delivery boxes (solution 9) by Carrier is done. The delivery boxes are actually a delivery room, which later on can be used for other purposes. In the room for instance tools could be safely kept and booked by tenants.

Smart Traffic Management

Insero has together with NOAE (Network of Automotive Excellence) implemented an information system for drivers (solution 10). Effects on travel time and the drivers’ experiences will be evaluated.

KTH has developed a smart phone application (solution 10) to follow up changes in travel behaviour. In the same application, information about renewable fuels in Stockholm will be shown. The application is launched.

Alternative fuel driven vehicles

As part of the GrowSmarter project, Fortum will install up to 10 charging stations and one fast charger (solution 11). The fast charger is installed in Årsta. The normal chargers are also installed in Valla Torg.

The first four refuelling stations (solution 11) for renewable fuels are up and running. The filling station in Årsta is expected to be built in 2018.

Stockholmshem launched yesterday its electrical carpool (solution 12) for tenants and habitants.

The Valla Torg Electrical Car Pool

Communication and marketing

In Stockholm Emma Borggren-Franck has taken the responsibility of the demonstration of smart solutions. Several study visits have been organised and still more are planned for this year. There has also been a great interest for presentations of the smart solutions implemented in Stockholm. A few weeks ago we presented our experiences in Brussels and last week I was in Wien and Bratislava presenting results and experiences. In spring there are two events planned. One will be focused on the smart solutions in Slakthusarea and the second one on smart solutions for tenants in Valla Torg.

Presenting GrowSmarter in Bratislava, Slovakia

Discussed in this blog

Solution 1: Efficient and smart climate shell refurbishment

Solution 2: Smart building logistics

Solution 5: Smart street lighting

Solution 6: Waste heat recovery

Solution 9: Sustainable delivery

Solution 10: Smart traffic management

Solution 11: Alternative fuel-driven vehicles

Solution 12: Smart mobility solutions

Mika Hakosalo

Site Manager, Stockholm

For the previous blog post, click here

23 October 2017

Barcelona blog #7: Urban-scale air quality monitoring and microdistribution

Read about how Barcelona will pilot a beyond state-of-the-art wind and air quality monitoring network, including how it will integrate with the GrowSmarter platform. In addition, the first results from our last-mile delivery services with electric bicycles are available!




Action area 2: Integrated Infrastructures
To see all the measures to be implemented, click here.

Sensor deployment in the 22@ district of Barcelona
Within GrowSmarter, measures are being carried out to develop an air quality model at the urban-scale using Computational Fluid Dynamics (CFD) simulations. In order to provide real-case inputs for the operational air quality nowcasting and the short-term forecasting of the CFD models, a set of monitoring sensors will be deployed in an initial pilot area in Barcelona. The monitoring nodes, composed of wind and air quality sensors, will be installed in 4 Smart Towers in the 22@ district. This use case will also include vehicle counting equipment for emission monitoring purposes.

An urban-scale air quality model - why?
Air quality and associated impacts on public health are matters of growing concern in many urban areas. Public administration and health agencies are tasked to monitor the quality of air and, eventually, to make model forecasts to assist the adoption of reactive measures and to warn the public of air pollution that could affect vulnerable groups of citizens.

Urban-scale pollutant dispersion models require of two critical inputs: high-resolution wind fields near urban-scale morphologies (buildings) and pollutant sources (mainly derived from vehicle combustion) through sensors and emission inventories. Today, the increase in computational capabilities is making it possible to envisage a near-future scenario in which Computational Fluid Dynamics (CFD) models will be used to simulate urban-scale winds and pollutant dispersion operationally. In this scenario, the massive deployment of low-cost sensors for monitoring wind and the concentration of critical pollutants will be critical.


Mesh of Barcelona, obtained from LIDAR data, topography and cadastre data



Results for wind field (speed and direction) obtained from CFD simulation



Web-based graphical user interface for visualisation of air quality results


Sensor deployment at 22@ district of Barcelona
Using the city of Barcelona as a test bed, this use case will deploy a low-cost sensor network to extend the current monitoring network of environmental sensors to selected urban areas of Barcelona. Real-time data will be used to initialise and validate an in-house CFD-based high-resolution (tens of meters, hourly output) urban-scale air quality model before its operational implementation. This system is being developed at the Barcelona Supercomputing Center (BSC) in a joint collaboration with the Barcelona City Council (IMI - Municipal Institute of Information) and the CAPTOR project, who provides the monitoring nodes that integrate the air quality and wind sensors.

The monitoring nodes for wind and air quality will be installed in 4 GrowSmarter Smart Towers in the 22@ district, also including vehicle counting equipment for emission monitoring purposes.

The use case will deploy a monitoring system for:

  • Wind field (speed and direction),
  • Air quality (NO2 and O3),
  • Flow of vehicles (vehicles per minute).


  • Each monitoring node will be composed of an Arduino node, which have been developed as part of the Horizon 2020 CAPTOR project, and integrating several sensors on a single device. This control hardware node is in charge of monitoring, management and post-processing of raw data coming from the following integrated sensors:

    • a Davis anemometer for wind direction and velocity
    • several (up to 3) NO2 MOX sensors
    • several (up to 3) O3 MOX sensors
    • vehicle sensor to detect flow of vehicles


    The environmental Arduino nodes will be deployed in the 22@ district and are self-contained packs that are designed to be installed on public street lights and poles at a minimum height of 5 meters to avoid vandalism. All the devices in this pack are designed to be long-lasting and highly durable to reduce maintenance. This installation pack is composed of the components shown in below:


    Components of the Arduino pack


    The collected data will be sent to the GrowSmarter platform through the GrowSmarter API. The data will be used by the air quality monitoring software (nowcasting) developed by BSC-CNS that can predict wind fields in the streets with a resolution of 10 metres and 1 hour, and gas concentration with resolution of 10 metres and 1 hour. These resolution values are beyond the state of the art in air quality modelling for nowcasting.

    Moreover, the sensing data information and the sensor-derived nowcasting maps will be offered as Open Data to third parties through the GrowSmarter platform so that consumers of these environmental data can use this information to provide environmental monitoring services.

    Benefits for GrowSmarter
    This use case is a clear example of synergies gained from integrating infrastructures of GrowSmarter: The Smart Towers will provide support for the monitoring nodes and provide communication infrastructure, while the GrowSmarter platform will provide the required data storage for the collected data. The air monitoring software is an example of a service developed on top of the GrowSmarter platform that will provide monitoring services. Moreover, this use case is an example of collaboration among different entities and projects beyond the GrowSmarter project.

    Action area 3: Sustainable Urban Mobility
    To see all the measures to be implemented, click here.

    First results on the microdistribution of freight in Barcelona
    In January 2017 the microdistribution platform became operational. The service is offered by the company Vanapedal. The municipality of Barcelona has leased a public space to the company, which is obliged to be neutral in the market and work with any logistics operator willing to use the service.

    The main objectives of the measure are to:

    • Introduce a more efficient and effective freight transport system in the city centre,
    • Analyse the administrative management of a public concession,
      Analyse the business model of the service,
    • Analyse the reduction in CO2 and vehicle kilometres due to shift from conventional vehicles to electric bikes, and
    • Test a new sensor system to measure pollutants and other environmental parameters using the bicycles of the service.


    The Last Mile Operator Vanapedal offers different services, the most relevant of which is the distribution of parcels and packages from other carriers to their final destination. Carriers bring these items to the microplatform which is conveniently located close to the city centre. These are then transferred to electric bicycles and tricycles. The last mile is then performed by drivers from Vanapedal following their established routes. Parking and access regulation do not apply to bicycles, so no delivery time window restrictions affect the distribution.

    The service has been running since January 2017 from the Estació de França location with success, although the market is difficult to reach since there are also competitors and some logistics companies have begun operating their own last mile deliveries using sustainable modes of transport.


    Location of the microplatform at Estació de França


    Currently, up to 9 bicycles are being used in daily operation. The company gathers all business information of their operations including the daily number of deliveries and pick-ups, the number of kilometres covered and the time needed to cover all routes. This information is being collected monthly and the first results of the analysis of this information have been made. During the first three months of operations, 23,000 journeys have been performed and an increase in the daily number has been noted.


    Average daily number of journeys


    In February, the average distance covered was of 65.5km/day, while in March this figure increased to 160km/day due to the introduction of three more tricycles.


    Km performed by all bikes daily between January and March 2017


    Also, the effectiveness of the deliveries is being monitored. So far, the average percentage of successful deliveries has been 92.73%. This value has increased over time, but it is seen as very good compared to conventional carriers.


    Evolution of the daily effectiveness of deliveries


    The next step is to continue analysing the data obtained from the operator of the microplatform and compare it with the data obtained from the sensors that have been installed in three bicycles that offer further information such as the routes followed or the concentration of contaminants.

    The last step of the process will determine how much traffic and CO2 this measure has reduced. This will help to encourage other cities to implement similar last mile services.

    Discussed in this blog
    Solution 8: Big data management
    Solution 9: Sustainable delivery

    Gonzalo Cabeza
    Site Manager, Barcelona

    For the previous blog post, click here
16 October 2017

Stockholm blog #7: Tenants are moving in...

The personnel from Skanska and Stockholmshem have been working hard to finalise the buildings so that the tenants can start moving back as planned in September. In the last weeks, construction workers have been working nights and weekends to accomplish this. Now the first tenants have moved in and can start using all the smart solutions we have implemented. As soon as the heating season starts (we all wish the first snow would just come!) we can start getting some indications on how energy efficient the buildings are.


Action area 1: Low-Energy Districts


What is happening in Valla Torg, Årsta and the Slakthus area buildings?


To see all the measures to be implemented, click here


The smart solutions for low energy districts will be rolled out in the building zones in Valla Torg, Årsta and the Slakthus areas (see map here). For an overview of the measures being implemented, click here.


In Valla Torg the refurbishment of the first multi-storey building (7G) is on the finish line. There is still some minor painting work to be done in apartments, but all energy efficiency solutions are implemented. Here are some photos of the building:


 



New insulated façade
New subcentre



Accumulator tanks, where the recovered heat from heat pumps are stored
The waste water heat exchanger


 



Photovoltaics on the roof

In this building the tenants have the possibility to use the Active House application from Fortum to control the temperature and lighting in the apartment.


The other two buildings under construction are also well on their way. The first half of the low-storey building 8 is finalised and in September tenants moved in. The other half will be finalised later this autumn.


building-8.jpg" />
Eastern half of building 8

The second multi-storey building 6 is going to be finalised by the end of this year.


building-6.jpg" />
Building 6

In the private condominiums Brf Årstakrönet, Veolia (who just changed their name to L&T) have installed all solutions for optimising the energy use in the building. These are listed below (with pictures):


1. Adaptive control system


2. Temperature control in each apartment


3. Measurement implemented for:


a) Hot water circulation losses


b) District heat energy


c) Electricity


d) Cold Water


4. Thermographic control


5. Smart control of ventilation in garage:


a) PPM


b) Temperature, humidity


6. Electrical hub installed


7. Electrical battery storage installed


8. PV Cells and control system installed



Action area 2: Integrated Infrastructures


To see all the measures to be implemented, click here


Installing smart LED-lighting


The smart LED-street lights (solution 5) have now been in operation for a year.


A Smart Connected City


In Stockholm the smart connected city will use the extensive fibre network provided and administered by Stokab, a company owned by Stockholm City Council (more information). Several Internet of Things applications and solutions can be built on top of the fibre network.


The implementation of sensors in the Slakthusarea has started. IBM, who is responsible for the open consolidated big data platform (solution 8), will analyse data to show how people move around in the Slakthusarea. This starts as soon as the sensors can provide data in October. The project team, platform for data management, analysis tools and methodology are all in place.


Waste heat recovery


Fortum’s open district heating (solution 6) system is now installed in the datacentre. The heat recover can heat up approximately 700 apartments.



Installations in the datacentre

Smart waste handling


The waste handling system provided by Envac was completed by the end of June. The pipelines, inlets and terminal of the smart waste handling system (solution 7) are in place. The terminal and inlets are now being installed.


 



Terminal
Pipe transporting waste



Container for waste
Inlets where tenants put their waste


 


Action area 3: Sustainable Urban Mobility


To see all the measures to be implemented, click here


Building logistics centre and delivery boxes


The Building logistics centre (solution 2), implemented by Carrier, will start handling more materials in autumn. Carrier has together with Skanska agreed which material streams can be best handled by the logistics centre, and these materials will be handled by the centre when the next phase of the refurbishment begins later in the autumn.


 


The implementation of delivery boxes (solution 9) by Carrier is being done alongside refurbishments of buildings in Valla Torg. When the tenants move back into their apartments starting in September, they can order packages and other deliveries straight to their homes instead of retrieving them from the nearest service point. The delivery from the service point to the building is carried out with cargo bikes.


Smart Traffic Management


KTH has developed a smart phone application (solution 10) to follow up changes in travel behaviour in a way that is more effective and has a greater response rate than traditional travel surveys. This will improve travel demand management measures. In the same application, information about renewable fuels in Stockholm will be shown. This information includes updated information on where each alternative fuel can be tanked, together with the most recent prices. The application will be launched when tenants have moved back later this autumn.


Alternative fuel driven vehicles


As part of the GrowSmarter project, Fortum will install up to 10 charging stations and one fast charger (solution 11). The fast charger is installed in Årsta. The normal chargers are also installed in Valla Torg.


The first three refuelling station (solution 11) for renewable fuels are up and running. The filling station in Årsta is expected to be built in the beginning of 2018.


Communication and marketing


In Stockholm several study visits have been arranged and there is high interest in the GrowSmarter solutions. As more and more smart solutions are implemented, the study visits will become more frequent. In October 2017 there will be an event demonstrating the smart solutions in Valla Torg. Here the focus is on city representatives. In November/December 2017 a similar event will be arranged in Slakthusarea. In spring 2018 an event is planned for tenants in Valla Torg.


A video has been produced showcasing the smart solutions implemented in Stockholm. The video can be seen here.








Discussed in this blog

Solution 2: Smart building logistics


Solution 5: Smart street lighting


Solution 6: Waste heat recovery


Solution 7: Smart waste collection


Solution 8: Big data management


Solution 9: Sustainable delivery


Solution 10: Smart traffic management


Solution 11: Alternative fuel-driven vehicles


 


Mika Hakosalo


Site Manager, Stockholm


For the previous blog post, click here

9 June 2017

Stockholm blog #6: Adaptive control for smart cities

The winter and spring weather in Sweden has been very odd, with the weather changing from cold to warm from one day to another. This year we had minus degrees and snow during Easter in late April. With the adaptive systems we have installed we have still been able to keep a steady indoor temperature inside the apartments. With traditional systems it would have either been too cold or too warm. We have also received good results from the smart street lighting and the combined renewable energy production, control and storage system. All these solutions are examples of adaptive control in cities. In this blog I will write some more about these and the other adaptive control systems we are now implementing.


Action area 1: Low-Energy Districts


What is happening in Valla Torg, Årsta and the Slakthus area buildings?


To see all the measures to be implemented, click here


The smart solutions for low energy districts will be rolled out in the building zones in Valla Torg, Årsta and the Slakthus areas (see map here). For an overview of the measures being implemented, click here.



In Valla Torg the refurbishment of the first multi-storey building (7G) is going forward and many of the smart energy saving solutions are already implemented. All installations will be finalised in the summer and tested in August. The tenants start moving back into their apartments in September. When the next heating season starts, we can begin evaluating exactly how much energy we can save in these buildings. In this building the tenants have the possibility to use the Active House application from Fortum to control the temperature and lighting in the apartment. They can also use the home/away button, which means that when they leave the apartment to go to work or on holiday, they can cut unnecessary electricity and lower the temperature a few degrees in the apartment. With a mobile application they can push the home button, which will adjust heating and electricity back to normal before they arrive home.


In the private condominiums Brf Årstakrönet the adaptive control system by Veolia has been in operation for more than a year and has resulted in substantial energy savings as well as more stable temperatures in the apartments over the year. The energy hub that consists of photovoltaics, a current equalizer and battery storage has been in use for half a year. The system provides a higher output of solar electricity and a better interface between the production and use of locally produced electricity.


In Slakthusarea the refurbishment of building 8 is well on its way and will be finalised in autumn 2017 by the Fastighetskontoret (Real estate administration office). The selection for a substitute building in Slakthusarea is done and is only waiting for an official approval from the Commission. Work on the substitute building can begin in summer 2017 and all energy saving solutions are to be implemented during this year.


Action area 2: Integrated Infrastructures


To see all the measures to be implemented, click here


Installing smart LED-lighting


The smart LED-street lights (solution 5) have now been in operation for a year. There are three different methods used to adjust the street lights to use less energy while still providing the same sense of security for pedestrians and bicyclists. The first method is applied to street lights on a walking/bicycling path. When there is no movement the lights reduce to 40% capacity. When a person approaches, the lights ramp up to full power and when the person has passed they dim down again. The second method is that each individual luminaire keeps track of when it is turned on and off and uses those times to calculate a middle point. From that middle point, the brightness is lowered to 66% for a duration of 6 hours, or until it is turned off. In the third method, all luminaires are connected to a Central Management System where a dimming schedule runs. In the dimming schedule, lighting levels are set according to sunset/sunrise and specific times during the night. The lighting is turned on at sunset to 100%, at 10 PM it is dimmed to 67%, at 1 AM it is dimmed to 50%, at 5 AM it dims up to 67% again, at 6 AM 100% and is turned off again at sunrise.


A Smart Connected City


In Stockholm the smart connected city will use the extensive fibre network provided and administered by Stokab, a company owned by Stockholm City Council (more information) Several Internet of Things applications and solutions can be built on top of the fibre network.


The implementation of sensors in the Slakthusarea has faced data protection issues which needed to be examined very carefully. Even if both solutions have previously been used at small scales in other cities, they have never been combined. The combination of sensors measuring the pedestrian, bicycle and vehicle traffic in the area will provide very accurate information about the movement of people. A communication plan must also be produced to communicate to citizens that sensors are collecting data from passing vehicles and mobile phones to be able to provide better traffic flow in the areas, especially during events. The implementation of sensors will be done during August so that the communication plan can be finalised before implementation.


IBM, who is responsible for the open consolidated big data platform (solution 8), will analyse data to show how people move around in the Slakthusarea. This starts as soon as the sensors can provide data. The project team, platform for data management, analysis tools and method are all in place.


Waste Heat recovery


Fortum’s open district heating (solution 6) system has been recovering heat from a Supermarket in Farsta, some 5km south of the Slakthus area. The installations in the data centre will be done in June and as soon as the heating season starts again, the waste heat can be used to heat buildings.


Smart waste handling


The waste handling system provided by Envac will be completed by the end of June. The underground parts of the smart waste handling system (solution 7) are in place (see image below). The terminal and inlets are now being installed.



Action area 3: Sustainable Urban Mobility


To see all the measures to be implemented, click here


Building logistics centre and delivery boxes


The Building logistics centre (solution 2) implemented by Carrier, will start handling more materials in autumn. Carrier has together with Skanska agreed which material streams can be best handled by the logistics centre, and these materials will be handled by the centre when the next phase of the refurbishment begins later in the autumn.


The implementation of delivery boxes (solution 9) by Carrier is being done alongside refurbishments of buildings in Valla Torg. When the tenants move back into their apartments starting in September, they can order packages and other deliveries straight to their homes instead of retrieving them from the nearest service point. The delivery from the service point to the building is done by cargo bikes.


Smart Traffic Management


Insero is together with NOAE (Network of Automotive Excellence) and Global car OEM, implementing an information system for drivers (solution 10). In Stockholm, ten traffic lights are equipped with software that can communicate and provide information about the status of the light and when it is about to switch to another colour. This is achieved through a data connection between the traffic light, the cars’ on board software and GPS, and a central computer handling the calculations. Through a special device in the car, the driver can receive information on what speed to adopt in order to reach a green light at the next intersection. This information tool will be tested in two cars starting in May/June 2017. Effects on travel time and the drivers’ experiences will be evaluated.


KTH has developed a smart phone application (solution 10) to follow up changes in travel behaviour in a way that is more effective and has a greater response rate than traditional travel surveys. This will improve travel demand management measures. In the same application, information about renewable fuels in Stockholm will be shown. This information includes updated information on where each alternative fuel can be tanked, together with the most recent prices.


Alternative fuel driven vehicles


As part of the GrowSmarter project, Fortum has planned to install up to 10 charging stations and one fast charger (solution 11). The fast charger is installed in Årsta. The normal chargers will be installed in Valla Torg, Slakthus area and Årsta by the end of 2017.


The first refuelling station (solution 11) for renewable fuels is up and running. The filling station in Årsta is expected to be built in the beginning of 2018.


Communication and marketing


In Stockholm several study visits have been arranged and there is high interest in the GrowSmarter solutions. As more and more smart solutions are implemented, the study visits will become more frequent. In August 2017 there is a plan to have an event demonstrating the smart solutions in Valla Torg. Here the focus is on city representatives. In November/December 2017 a similar event will be arranged in Slakthusarea. In spring 2018 an event is planned for tenants in Valla Torg.


A video has been produced showcasing the smart solutions implemented in Stockholm. The video will soon be available at the GrowSmarter website.


Mika Hakosalo


Site Manager, Stockholm

12 March 2017

Stockholm blog #5: a variety of smart solutions in implementation

GrowSmarter has reached a milestone year: by the end of 2017, all the smart solutions will be in place and in use in Stockholm. Smart solutions from each area of action have already been implemented, so the work is now shifting from implementation to demonstration and evaluation of the project. A lot of emphasis is put on communication and marketing activities in 2017 and 2018. Each partner will make a communication plan and contribute to the demonstration site’s general communication activity plan, but also look into how the smart solutions can be marketed internationally.


Action area 1: Low-Energy Districts


To see all the measures to be implemented, click here.


What’s happening in Valla Torg, Årsta and the Slakthus area buildings?


The smart solutions for low energy districts will be rolled out in the building zones in Valla Torg, Årsta and the Slakthus area (see map here). For an overview of the measures being implemented, click here.


In Valla Torg The refurbishment of the first higher storey building (7G) started in September 2016. Insulation of facades, installation of new windows and other climate shell related measures were carried out by Skanska.


 


The refurbishment of the first lower storey building (8H) started in October 2016. Work on insulating facades and changing windows has already been done, and other climate shell measures will be finalised by the end of March 2017.


The refurbishment of the second higher storey building (6F) started in December 2016. All of the measures to be implemented are part of the energy efficient climate shell (solution 1).


In the private condominia, Brf Årstakrönet, the implementation (solution 1) and (solution 3) started in January 2016 with the installation of an adaptive control system by Veolia. Veolia has also installed photovoltaic arrays (solution 4) on the roofs. The solar energy production is connected with energy storage (batteries), so that solar energy can be stored and used when it’s needed. The same solutions will also be implemented in the Slakthus area buildings during later stages of refurbishment.


In Slakthus the refurbishment of building 8 by the Fastighetskontoret (Real Estate Administration Office) started in October 2016. Unfortunately, the overall budget for the Real Estate Administration was cut, so the second building (building 7) cannot be refurbished in 2017 as planned. Therefore, we are working on finding a replacement building. The alternative building will also be situated in Slakthus area.


Action area 2: Integrated infrastructures


To see all the measures to be implemented, click here.


Installing smart LED-lighting


As described in an earlier blog, the installation of smart LED-street lights (solution 5) was finalised in June 2016 in Valla Torg and has now been in use for a full winter season. The measure will bring an estimated 50% energy savings, but actual figures have not yet been analysed.


A Smart Connected City


In Stockholm the smart connected city will use the extensive fibre optic network provided and administered by Stokab, a company owned by Stockholm City Council. Several Internet of Things applications and solutions can be built on top of the network.


In April 2017 sensors will be installed in the Slakthus area. One set of sensors will measure the pedestrian and bicycle traffic in the area. Another set of sensors will analyse vehicle traffic. We are especially interested in understanding how people travel to events that take place in this area: there are three sports arenas situated close to each other which host events year-round.


We will also install sensors for measuring air pollution. These will be placed in the same locations as the vehicle transport sensors. The real-time data that is collected will be delivered to an open consolidated big data platform for further analysis. A workshop with city departments and other interested parties is planned for the 8th of March to define the types of analysis to be done. Later in spring when the first set of data has been analysed, further workshops will be planned to define what kind of applications can be developed for lowering transport-based emissions based on the real-time data. In doing this we are defining ways to provide higher quality of life for citizens with smart connected solutions.


IBM, who are responsible for the open consolidated big data platform (solution 8), have two ongoing roles in GrowSmarter: “Sensing City Scale people movement” and “Movement of Pedestrians/Bicyclists”.


Under “Sensing City Scale people movement” IBM will analyse data on the flow of people to show how people move in the Slakthus area over time by creating heat maps. This analysis will be combined with other data such as public transport capacity, traffic measurements, weather, etc. to see how well the different transportation modes and capacities are optimised in the area, especially during events with a lot of people in motion. The project team, platform for data management, analysis tools and method are all already in place.


In “Movement of Pedestrians/Bicyclists” IBM will measure and study in detail specifically how pedestrians move in the city. A prototype user interface environment has been developed on the Bluemix platform. Sample data sets from relevant data sources have been uploaded into the Bluemix environment and made available for users, including vehicle traffic measurement data, bicycle traffic measurement data, bicycle accident data, and weather data for specific locations in the city. End user functions and graphical visualisation tools have been developed.


Together with the Traffic Administration, a plan for implementing new sensor data sources has been made. There will be 7 video sensors in the city connected via the fibre optic network to the Bluemix platform, which will feed into the traffic planner user environment in Bluemix. These sensors will be able to measure the flow, volume and direction of pedestrians, cyclists and vehicles in the selected city areas covered.


Waste Heat recovery


Fortum’s open district heating (solution 6) will be implemented in two locations. In Västberga, waste heat from data centres will be integrated into the district heating system.The same will be done for waste heat from Supermarkets in Farsta (some 5km south of the Slakthus area). The agreements have been signed and the installation in the Supermarket is completed. Due to delivery problems the heat pump could not be delivered as planned in March, so the installation in the data centre is postponed until June. When the solutions are in operation, the waste heat collected can be distributed into the district heating system and provide heat and hot water to more than 1,000 apartments.


Smart waste Handling


The waste handling system provided by Envac will be completed in June this year, with the terminal and inlets being installed during spring 2017. The different waste types will be separated by tenants into different coloured bags. The tenant places the bags in the inlet, and each bag colour is automatically identified and measured. Data from all six buildings in the project will be collected. The waste is then transported in underground pipes to the terminal. From the terminal the waste bags are sent to the sorting facility, where the different coloured bags are separated for recycling.


The smart waste handling has several benefits. It saves space compared to conventional waste containers, which can then be used for other purposes. The system also brings about benefits for hygiene and reduces bad odours. As the waste is piped to the terminal for collection, traffic for collecting waste at buildings will be reduced, meaning reduced traffic emissions but also less noise at residential buildings.


Action area 3: Sustainable Urban Mobility


To see all the measures to be implemented, click here.


Building logistics center and delivery boxes


The building logistics centre (solution 2), implemented by Carrier, started in September 2016 with the delivery of windows to Valla Torg. Carrier is together with Skanska discussing which material streams can be best handled by the logistics centre. The construction logistics are part of the production process, so the better production is planned and organised, the easier it is to provide just-in-time deliveries to construction sites. The materials are delivered outside work hours (after 5pm) so that they are available in the next morning at the construction site.


The implementation of delivery boxes (solution 9) by Carrier will be done in three buildings as part of the 2017 refurbishment plan in Valla Torg. Tenants can order packages and other deliveries straight home instead of picking them up from the nearest service point. The delivery from the service point to the building is done by cargo bikes.


Smart Traffic Management


Insero, together with NOAE (Network of Automotive Excellence) and Global car OEM, is implementing an information system for drivers (solution 10). In Stockholm ten traffic lights are equipped with software that can communicate and relay information about the status of the light and when it is about to switch. This is achieved through a data connection between the traffic light, the cars’ onboard software and GPS, and a central computer handling the calculations. Through a special device in the car, the driver will receive information about what speed to drive in order to reach a green light at the next junction. This information tool will be tested in two cars starting in March 2017. Effects on travel time and the drivers’ experiences will be evaluated.


KTH has together with Info24 (now Tingcore) developed a smartphone application (solution 10) to study changes in travel behaviour in a way that is more effective and has a greater response rate than traditional travel surveys. This will improve the travel demand management measures. In the same application, information about renewable fuels in Stockholm will be shown. This information contains updated information on where each alternative fuel can be tanked, together with most recent price.


Alternative fuel driven vehicles


As part of the GrowSmarter project, Fortum has planned to install up to 10 charging stations and one fast charger (solution 11). The fast charger is installed in Årsta. The normal chargers will be installed in Valla Torg, Slakthus area and Årsta during 2017.


The first refuelling station (solution 11) for renewable fuels is up and running. The filling station in Årsta is expected to be installed in the beginning of 2018.


Communication and marketing


In Stockholm several study visits have been arranged and there is a great interest in the GrowSmarter solutions. As more and more smart solutions are implemented, the study visits will become more frequent. In August 2017 there is a plan to have an event demonstrating the smart solutions in Valla Torg. Here the focus is on city representatives. In November/December 2017 a similar event will be arranged in the Slakthus area. In spring 2018 an event is planned for tenants in Valla Torg.


 


All Stockholm partners will produce their own communication activities plan in April, and contribute to an overall communication activities plan for the Stockholm site. In addition, the partners will start producing a marketing plan for their smart solutions as soon as the implementation is completed.


Mika Hakosalo


Site Manager, Stockholm

31 October 2016

Stockholm blog #4: from nothing to everything all at the same time

GrowSmarter is a complex project in which many solutions are linked to each other and both planning and implementation must happen in an integrated manner. This is very evident in Valla Torg, where the tenants must first vacate the buildings before the smart solutions can be implemented in and around the buildings. As this process didn’t start as planned in February 2016, but rather in August, we are now in a very hectic implementation phase where everything happens at the same time, as we still need to keep the original timetable. In this blog I will explain in more detail everything that will happen in the next few months to come.


Action area 1: Low-Energy Districts


What is happening in Valla Torg, Årsta and the Slakthus area buildings?


To see all the measures to be implemented, click here.


For those of you who didn’t have a chance to read my previous blog posts, the smart solutions for low energy districts will be rolled out in three building zones, namely Valla Torg, Årsta and the Slakthus area (see map here). For an overview of the measures being implemented, click here. In Valla Torg tenants began leaving the buildings in August and the first high-story building has scaffolding (pictured). Work on the façade will start in October. The walls will receive more insulation and new energy-efficient windows will be installed by Skanska. The interior work will also start at the same time. Old pipelines will be removed and new insulated pipelines will be installed. All these measures are part of the energy efficient climate shell (solution 1).


In the private condominia Brf Årstakrönet, the refurbishments (solution 1) and (solution 3) started in January 2016 with the installation of an adaptive control system by Veolia. Veolia will also install photovoltaics (solution 4) on the roofs upon receiving the building permit. The same solutions will also be implemented in the Valla Torg and Slakthus area buildings during later stages of refurbishment.


The real estate administration office (Fastighetskontoret) has made a procurement of a building contractor for Slakthusarea, but the decision has been appealed. As soon as the court has given its decision the work can continue.


Action area 2: Integrated infrastructures


To see all the measures to be implemented, click here.


Installing smart LED-lighting


The installation of smart LED-street lights (solution 5) was finalised in June in Valla Torg. The adaptive LED-lighting will reduce energy consumption by 50% while still providing the same sense of security along walking and bicycling paths. Each street light features a radar detector that senses movement on the path (Picture). As soon as any movement is detected, the light is activated and the movement is communicated wirelessly by radio to a number of nearby street lights. As a result, cyclists and pedestrians experience normal illumination levels along their entire route. In Stockholm the lights are not fully turned off during periods without movement, but rather dimmed down and then activated to full light as soon a person approaches.



Smart LED-lighting in Stockholm

Waste heat recovery


Fortum’s open district heating (solution 6) will be implemented in two locations. Waste heat from Data Centres in Västberga and waste heat from Supermarkets in Farsta (some 5km South of the Slakthus area) will be integrated into the district heating systems. The agreements have been signed and the installations will begin in October-November. When operational, the waste heat collected will be distributed into the district heating system and provide heat and hot water to more than 1,000 apartments.


A smart connected city


In Stockholm the smart connected city will use the extensive fibre optic network provided and administered by Stokab, a company owned by Stockholm City Council. Several Internet of Things applications and solutions can be built on top of the fibre optic network. Together with different departments and city owned companies, we are defining ways to provide higher quality of life for citizens with smart connected solutions in a series of workshops. We will start the process with defining the users’ needs. We have defined three groups of users: inhabitants, visitors and companies. In the Slakthus area we are focussing on visitors and companies, while in Valla Torg the focus is on inhabitants. In my last blog I addressed some of the activities in the Slakthus area, so in this blog I will cover how apartments with simple installations can provide many new functions.


In residential houses, as the tenants change over time, we should install equipment which can be used by several end users and for several purposes. Let’s say we install a movement sensor and water meters in every apartment. If the inhabitant is old, maybe the relatives would like to have a way to monitor her well-being. For example, a simple alarm function could be built and an automatic message sent to relatives when the motion sensor senses the person is inside the apartment, but has not used water for 12 hours. We can also collect water use data and the housing company could, for instance, detect leakages when water is being used and no one is home. If we realise that people use water in different ways, from very little to very intensively, we can create individual water billing so that everyone only pays for the water they use.


IBM, who are responsible for the open consolidated big data platform (solution 8), are involved in two parts of the project: “Sensing City Scale people movement” and “Movement of Pedestrians/Bicyclists”.


In “Sensing City Scale people movement” IBM planned to analyze mobile phone data and create heat maps to show how people move in the city over time. This analysis was to be matched against other data such as public transport capacity, traffic measurements, weather, etc. to see how well the different transportation modes and capacities are optimised in the city. The project team, platform for data management, analysis tools and method are all in place. A subcontractor was identified and final negotiations for delivery of Telco data were in progress at the beginning of 2016, with the project start scheduled for 1 February 2016.


But an unexpected issue arose. Based on a thorough legal assessment of the current Swedish Personal Data Legislation (PUL) and the EU General Data Protection Legislation (EU GDPL), the subcontracted Telco cannot provide the requested mobile telephone data for citizens of Stockholm in a way that would make it useful to the use case defined by IBM Research Dublin Lab. The only legally approved way for getting access to mobile phone trajectory data is to ask the citizens to voluntarily participate in the project and thus explicitly give consent for the project to track the movements of their mobile phones over time.


The merits, challenges and feasibility of this alternative approach will be assessed by the City of Stockholm and IBM, and a decision on whether to attempt this approach - by consent will be made in 3Q 2016.


In “Movement of Pedestrians/Bicyclists” IBM will measure and study in detail especially how pedestrians move in the city. A prototype user interface environment has been developed in the Bluemix platform. Sample data sets from relevant data sources have been uploaded into the Bluemix environment and made available for the users, including vehicle traffic measurement data, bicycle traffic measurement data, bicycle accident data, and weather data for specific locations in the city. End user functions and graphical visualization tools have been developed, e.g. new work project definition, traffic data selection, report generation, and graphical data visualization.


A plan for implementing new sensor data sources in Aug/Sept 2016 has been agreed upon with the Traffic Administration. This will consist of 7 video sensors in the city infrastructure connected through the city fiber optic network to the Bluemix platform. Data from these sensors will be uploaded into the traffic planner user environment in Bluemix. These sensors will be able to measure the flow, volume and direction of pedestrians, cyclists and vehicles in the selected city areas covered.


Smart waste handling


The underground parts of the smart waste handling system (solution 7) provided by Envac will be implemented in October and November (pictures). The terminal and inlets will be implemented during the beginning of 2017. The waste is compacted right below the waste inlet in the storage pipe instead of upon arrival to the waste terminal. The compacted waste allows for smaller pipes and a reduction of the airflow by as much as 50%. These factors together result in a reduction of energy consumption up to 50%. The solution will consume less energy per tonne of collected waste than any other comparable traditional waste collection, including ordinary waste collection vehicles.






Action area 3: Sustainable Urban Mobility


To see all the measures to be implemented, click here.


Building logistics centre and delivery boxes


The building logistics center (solution 2) and delivery boxes (solution 9) will be implemented by Carrier starting in October and November. The location of the buildings logistics centre has changed and will now be in Slakthus area. Carrier has together with Skanska discussed which material streams can be best handled by the logistics centre. The construction logistics are part of the production process, so the better production is planned and organised, the easier it is to provide just-in-time deliveries of materials to construction sites. Typically the materials are delivered outside work hours (after 5pm) so that they are available the next morning at the construction site. There are several benefits of the construction logistics centre. First, there are fewer materials wasted and damaged at the construction site, along with less traffic to and from the construction site. The construction site can also be kept clean, as the packaging waste is regularly removed. What’s more, production is enhanced as materials needed for work are constantly available and it is always clear where the materials are and how much is in stock.


Delivery boxes (pictured) are installed in the entrance of the refurbished buildings in Valla Torg next to the post-boxes. Tenants can order packages and other deliveries straight to their homes instead of retrieving them from the nearest service point. The delivery from the service point to the building is done by cargo bikes.




building_logistics.jpeg" />


Smart Traffic Management


Insero, together with NOAE (Network of Automotive Excellence) and Global car OEM, is implementing an information system for drivers (solution 10). In Stockholm around ten traffic lights will be equipped with software that can communicate and inform users about the status of the light and when it is about to change. This is achieved through a data connection between the traffic light, the cars’ onboard software and GPS, and a central computer handling the calculations. Through a special device in the car, the driver will receive information on what speed to adopt in order to reach a green light at the next intersection. This information tool will be tested in two cars for a few months’ time. Effects on travel time and the drivers’ experiences will be evaluated.


Alternative fuel driven vehicles


As part of the GrowSmarter project, Fortum has planned to install up to 10 charging stations and one fast charger (solution 11). The fast charger will soon be installed in Årsta. The location has been selected and the charger has already been delivered. The normal charging stations will be installed in Valla Torg, the Slakthus area and Årsta.


The first refuelling station (solution 11) is up and running (picture). The filling station in Årsta is expected to be established in the beginning of 2017.



Citizen engagement


A citizen engagement event was organised in Valla Torg in September. The event was very successful with around 500 visitors and positive feedback. The event was also the launch of the refurbishment in Valla Torg, and the audience had the opportunity to get information both on the GrowSmarter project and the different smart solutions from our partners, and to visit the exhibition apartments.







Mika Hakosalo


Site Manager, Stockholm

2 December 2015

Stockholm Blog #1: Back to the Future

Almost one year ago work on the Stockholm site started in GrowSmarter. Looking back at this year it has been a trip back to the future. The future as being the smart city with all the innovative solutions that will be implemented in Stockholm.


What we learned during this first year is that a great future is built with a thorough understanding of the past and present.


There are logical reasons why the city is built and organised in a certain way. Creating a smart, sustainable city is a question of using the existing structure, adapting it, or creating a new one. The GrowSmarter project are doing all of these to create the smart city of Stockholm.



Action area 1: Low-Energy Districts

Introducing Valla Torg in Årsta: using the past to shape the future


Facts about Valla Torg in Årsta

Construction year: 1961

Floor space: roughly 30 000 m2

Energy consumption: 155 kWh/m2 per year


The goal of the City of Stockholm is to lower its CO2 emissions to three tons per capita by 2015. We are working hard to make energy consumption more efficient in the city’s own properties, committing to the Covenant of Mayors with our Sustainable Energy Action Plan and as part of the GrowSmarter project create more low energy districts.


In the suburban area of Valla Torg in Årsta, built at the beginning of the 1960’s, a number of smart solutions will be implemented, from energy efficiency measures to smart lighting, smart waste handling and sustainable mobility.


One of our key areas of work is also refurbishing six residential buildings in the area which currently have 302 apartments. In line with the GrowSmarter concept of integration and our own philosophy in Sweden towards sustainability which involves using what is already there and adapting it to today’s standards. Inside, the buildings will contain a lot of new technology, with very small changes made to the facades.




The energy efficiency measures implemented in the residential buildings will reach an energy use level that is lower than the requirements for new buildings in Stockholm and the level of near-zero-energy-buildings in Sweden, beating the 25 percent reduction in energy consumption after refurbishment outlined in the Building Regulations (BBR) of the Swedish National Board of Housing, Building and Planning (Boverket).


To achieve these stiff targets, we have been working on understanding the existing structure, its limitations and possibilities to see how the solutions can be implemented for best possible results. Over the last year we have conducted detailed discussions, expert statements, pre-studies and computer simulations the implementation plan is done and we are ready to turn the clock back to the future and start the rolling out the solutions at the beginning of 2016.

Source: The Swedish Property Federation (Fastighetsägarna).





Action area 2: Integrated infrastructures

It’s a-buzzing – taking Stockholm to the next level


Another interesting process during this past year has been related to the buzz words ‘Internet of Things’, ‘Connectivity’ and ‘Big Data’. Stockholm has good connectivity throughout the city but how could we use what is already there and take Stockholm to the next level to become a smart, intelligent city?


To answer that question we needed to firstly understand how things currently work in terms of city processes and functions, and also end-user value, secondly where development in this sector is headed (what kind of connectivity, data will be required in 5 to 10 years from now), and thirdly to find a place in the city where the impact would be greatest and instantly valuable for citizens. This spot was the Slakthus area.


buildings_7_and_8.jpg>


The challenge with Slakthus area and its digitalisation is not just the implementation of technology; the technology could be up and running in three months - the challenge is to understand all the city’s different needs in the Slakthus area, and get different functions in the city to join up and use shared sensors, Wi-Fi, big data. We want to avoid having lots of different data platforms working in parallel and instead have them working all together in an integrated way. For instance, measuring pedestrian flows would be useful not only to control the brightness of street lights, but also for street maintenance.


It thus became clear that there is a huge need for integrated approach and that this needed to be addressed very early in planning processes. Bringing together key individuals from different departments in the city, from city planning, traffic department, development department, real estate department, IT department, environmental department, and the city owned fibre-network company, we held a first an internal workshop in August 2015 to discuss how this area will be in 2030 and to understand, how digitalisation could fit into a city structure that originates from the beginning of the 1900s.


Working so closely together in this way, at such an early stage was new and will be continued as regular workshops.



Action area 3: Sustainable Urban Mobility

Stockholm going fossil-free & sustainable urban mobility


The City of Stockholm has set a goal to be fossil-fuel free by 2040. One of the biggest challenges in achieving this goal is to lower transport emissions in the City. In GrowSmarter we will be testing and implementing a range of transport measures at a relatively small scale in Valla Torg, Västberga and the Slakthus area. The plan is to evaluate them and see if they could be implemented in large scale in Stockholm.




One of these is to get more efficient clean vehicles in Stockholm. In GrowSmarter we support this with implementing new stations for biogas fuel, charging points (see picture), route optimisation for clean vehicles, apps for drivers, and synchronized traffic lights to give preference for clean trucks. Another important measure is a more efficient transportation of goods and waste. The preparations have included a building logistics centre, a smart waste handling system and the above mentioned synchronisation of traffic lights.


A third important measure is reducing the need for travel and switching from cars to walking and biking. Here the preparations have included the consolidated big data platform, bicycle transports for light goods, an application for travel demand management, electrical car pools as well as electrical and cargo bike pools. All of these measures are going to be implemented during 2016.


I will be back soon with more experiences with implementing the first smart solutions in Stockholm in the next blog, but please feel free to share your thoughts and experiences this far in Stockholm.


Mika Hakosalo

Site Manager, Stockholm

30 November 2015

Barcelona blog #1: Urban ontology for a smart city

Our contribution from Barcelona is going to be short but hopefully informative. We focus mainly on the smart city data platform that we are developing, and the neighbourhood consultations we are carrying out.


Action area 1: Low-Energy Districts

Converting data: urban ontology for a smart city


City leaders in Barcelona understand the city as something dynamic and changing; a network of networks, as illustrated in their conceptual model of the smart city in Barcelona, which is broken down into three layers: People/ Information/ City Structure.


In order to systematically describe all the elements in a Smart City in terms of all stakeholders, activities, relationships, outcomes etc. Barcelona is working to develop a City Information Model for city ontology that could be used across all city systems and by all city stakeholders.


Currently, Barcelona has an open data portal, OpenData BCN30, which opens up city data sets to the public and has three main aims:


1. To increase the transparency of the City Council

2. To universalise data access

3. To promote innovation and the economic fabric


The GrowSmarter-BCN platform (GS-BCN in short) will allow the consolidation, aggregation and use of existing and new sensor data. Application developed by different use cases and measures will run on top of this platform to monitor and control the performance of lighting, environment, energy consumption, etc.


Like in Cologne, the idea behind this model is to enable data to be easily shared city wide and made available with consistent Application Programming Interfaces (APIs) so that developers could develop apps that straddle different city systems and so that services (such as payment systems, registration systems, management systems) could be reused across different city systems. It would also enable digital services that are developed for one city to be much more easily be used by another city.


Sustainable Urban Mobility


Barcelona is an extremely compact city, which offers an advantage for sustainability. However, it leads to serious challenges of noise, traffic congestion and pollution. We are working currently together with stakeholders who use the roads on a daily basis, not only citizens but taxi drivers and logistics vehicles to find the best solution for making Barcelona a cleaner, healthier city to live in.



Barcelona: building energy self-sufficiency


Barcelona is the first European city to stipulate that all buildings undergoing major refurbishment had to use solar energy to supply 60% of their running hot water requirements.